Documents
Every document permits ask for: who prepares it, in which format and at which step.
Create a project to get the list that applies to you and to check uploads.
Preparation
Notarised power of attorney (apostilled)
Why: Lets a trusted person apply for you if you cannot log in to the platform yourself.
- Prepared by
- Notary or Armenian consulate
- Format
- PDF, JPG, PNG · signed
Needed for: Power of attorney for a local representative; State registration of rights · only in some cases
Power of attorney for filing development-permit applicationsCertified Armenian translation of the POA
Why: Authorities accept documents in Armenian, so a foreign-language POA needs a certified translation.
- Prepared by
- Translation agency and notary
- Format
- PDF, JPG, PNG
Needed for: Power of attorney for a local representative
Power of attorney for filing development-permit applicationsOwnership or development-right certificate
Why: Proves the land or building is yours or that you have the right to build on it.
- Prepared by
- Cadastre Committee
- Format
- PDF, JPG, PNG
Needed for: Land rights and zoning check; Sketch design approval; Simplified design assignment (APA); Design permission (architectural-planning assignment); Design approval and construction permit; Demolition permit
State registration of real estateCadastral map / plot coordinates
Why: Shows the exact plot boundaries so the architect can place the building correctly.
- Prepared by
- Cadastre Committee
- Format
- PDF, JPG, PNG · up to 6 months old
Needed for: Land rights and zoning check
e-cadastre.am — e-services platform
Design
Engineering-geological survey
Why: Studies the soil so the foundation is designed correctly and the building can withstand earthquakes.
- Prepared by
- Licensed survey firm
- Format
- PDF, JPG, PNG
Needed for: Engineering surveys
Government Decision N 596-N of 19.03.2015 (procedure for development permits), consolidated textTopographic and cadastral survey
Why: Accurately measures the plot's terrain and boundaries, which the design is based on.
- Prepared by
- Qualified surveyor / geodetic firm
- Format
- PDF, JPG, PNG
Needed for: Engineering surveys
Government Decision N 596-N of 19.03.2015 (procedure for development permits), consolidated textTechnical-condition survey conclusion
Why: Assesses the existing building's condition to show whether it is safe to rebuild.
- Prepared by
- Licensed technical-survey firm
- Format
- PDF, JPG, PNG
Needed for: Engineering surveys · only in some cases
Government Decision N 596-N of 19.03.2015 (procedure for development permits), consolidated textDesign brief (technical specification)
Why: Your written requirements to the designer about what you want built.
- Prepared by
- Developer (with the designer's help)
- Format
- PDF, JPG, PNG
Needed for: Architectural and construction design
Government Decision N 596-N of 19.03.2015 (procedure for development permits), consolidated textDesign documentation
Why: The full drawings and calculations the building will be built from.
- Prepared by
- Licensed designer
- Format
- PDF, JPG, PNG
Needed for: Architectural and construction design; Simple design expertise; State complex expertise; Simplified construction permit; Design approval and construction permit
Form 2-1 Construction permit and design approval applicationDesigner's guarantee letter
Why: For small buildings the designer guarantees in writing that the design meets the codes, instead of an expert review.
- Prepared by
- Licensed designer
- Format
- PDF, JPG, PNG · signed
Needed for: Designer's guarantee letter; Simplified construction permit; Design approval and construction permit · only in some cases
Government Decision N 596-N of 19.03.2015 (procedure for development permits), consolidated textPositive expert conclusion
Why: Independent experts confirm the design is safe and meets the codes.
- Prepared by
- Licensed expert organisation (IV: state complex expertise)
- Format
- PDF, JPG, PNG
Needed for: Simple design expertise; State complex expertise; Design approval and construction permit · only in some cases
Government Decision N 596-N of 19.03.2015 (procedure for development permits), consolidated textEnvironmental impact (EIA) conclusion
If the object falls under the EIA law
Why: For large or hazardous projects it confirms they will not cause unacceptable harm to the environment.
- Prepared by
- Ministry of Environment (report by a licensed firm)
- Format
- PDF, JPG, PNG
Needed for: State complex expertise
Environmental impact expertise (EIA)
Approval
Passport or ID card
Why: Confirms who is applying; the platform checks the data automatically.
- Prepared by
- The applicant
- Format
- PDF, JPG, PNG
Needed for: Simplified design assignment (APA); State registration of rights
What is the 'Yes Em' ID platformPlot plan with the proposed siting
Why: Shows where on the plot the building will stand so the community can check distances and rules.
- Prepared by
- Architect or designer
- Format
- PDF, JPG, PNG
Needed for: Simplified design assignment (APA); Design permission (architectural-planning assignment)
Form 1-1 Design permission (architectural-planning assignment) applicationHeritage authority opinion
Requested by the community
Why: In historic or protected zones it confirms the works will not harm monuments.
- Prepared by
- Heritage authority (the community sends the request)
- Format
- PDF, JPG, PNG
Needed for: Design permission (architectural-planning assignment); Demolition permit · only in some cases
Government Decision N 596-N of 19.03.2015 (procedure for development permits), consolidated textApplication (form N 4-1)
Why: The official request asking the community to approve your exterior changes.
- Prepared by
- Owner or representative
- Format
- PDF, JPG, PNG · signed
Needed for: Sketch design approval
Form 4-1 Sketch design approval applicationSketch design
Why: Shows in drawings how the building's exterior will change.
- Prepared by
- Architect
- Format
- PDF, JPG, PNG
Needed for: Sketch design approval
Form 4-1 Sketch design approval applicationPermit application (N 2-1 or Պ-ՇԹԴ)
Why: The official request to approve the design and issue the construction permit.
- Prepared by
- Developer or representative
- Format
- PDF, JPG, PNG · signed
Needed for: Simplified construction permit; Design approval and construction permit
Form 2-1 Construction permit and design approval applicationLocal duty receipt or 20-digit payment code
Why: Proves you paid the community duty; without it the application will not be reviewed.
- Prepared by
- State e-payment system (20-digit code)
- Format
- PDF, JPG, PNG
Needed for: Simplified construction permit; Design approval and construction permit; Demolition permit
Government Decision N 596-N of 19.03.2015 (procedure for development permits), consolidated textDemolition application (form N 2-2)
Why: The official request to allow demolition of the building.
- Prepared by
- Owner or representative
- Format
- PDF, JPG, PNG · signed
Needed for: Demolition permit
Form 2-2 Demolition permit applicationDemolition design
Why: Describes how the building will be taken down safely without harming neighbours.
- Prepared by
- Licensed designer
- Format
- PDF, JPG, PNG
Needed for: Demolition permit
Form 2-2 Demolition permit applicationOwner's written consent or a contract that allows construction
If you are not the owner (leaseholder, user)
Why: If the land or building is not yours, the owner must allow in writing that you build or make changes there.
- Prepared by
- Owner (at a notary if needed)
- Format
- PDF, JPG, PNG · signed
Needed for: Sketch design approval; Simplified design assignment (APA); Design permission (architectural-planning assignment); Simplified construction permit; Design approval and construction permit; Demolition permit; Completion act and operation permit · only in some cases
Form 1-1 Design permission (architectural-planning assignment) application
Construction
Start-of-works notice (form N 2-5)
Why: Tells the community and the Inspectorate that works are starting so they can inspect.
- Prepared by
- Developer or representative
- Format
- PDF, JPG, PNG · signed
Needed for: Start-of-works notification
Form 2-5 Start-of-works noticeConstruction log book
Why: The site diary where all works and inspections are recorded.
- Prepared by
- Issued with the permit, kept by the contractor
- Format
- PDF, JPG, PNG
Needed for: Construction and supervision
Government Decision N 596-N of 19.03.2015 (procedure for development permits), consolidated textAs-built documentation
Why: Show how the building was actually built.
- Prepared by
- Contractor and technical supervisor
- Format
- PDF, JPG, PNG
Needed for: Construction and supervision; Completion act and operation permit
Government Decision N 596-N of 19.03.2015 (procedure for development permits), consolidated text
Completion
As-built measurement (with e-cadastre code)
Why: An exact measurement of the finished building that checks it matches the design.
- Prepared by
- Qualified surveyor (code generated on e-cadastre.am)
- Format
- PDF, JPG, PNG
Needed for: Acceptance commission act
e-cadastre.am — e-services platformCompletion application (form N 3-3-1)
Why: The official request for the completion act, after which the building can be used.
- Prepared by
- Developer or representative
- Format
- PDF, JPG, PNG · signed
Needed for: Completion act and operation permit
Form 3-3-1 Completion act / operation permit applicationAcceptance commission act
Why: A commission of specialists confirms the building is finished and ready for use.
- Prepared by
- Commission formed by the developer
- Format
- PDF, JPG, PNG · signed
Needed for: Completion act and operation permit; State registration of rights
Form 3-2-1 Entry of the acceptance commission actLocal fee receipts
Why: Prove you paid the community fees for the completion act and operation permit.
- Prepared by
- State e-payment system
- Format
- PDF, JPG, PNG
Needed for: Completion act and operation permit; Automatic completion act
Local duties and fees calculator (2026)Positive technical-survey conclusion
Why: In the simplified procedure it replaces technical supervision and confirms the house is safe.
- Prepared by
- Licensed technical-survey firm
- Format
- PDF, JPG, PNG
Needed for: Automatic completion act
Government Decision N 1969-N of 25.12.2025 (simplified procedure, Annex 4.1)Licensed architect's conclusion
Why: An architect confirms the built house does not differ materially from the design.
- Prepared by
- Licensed architect (based on a surveyor's measurement)
- Format
- PDF, JPG, PNG
Needed for: Automatic completion act
Government Decision N 1969-N of 25.12.2025 (simplified procedure, Annex 4.1)Completion act
Why: Officially confirms the building was built legally and is the basis for registering ownership.
- Prepared by
- Head of community (urban-permits.e-gov.am)
- Format
- PDF, JPG, PNG
Needed for: State registration of rights
Government Decision N 596-N of 19.03.2015 (procedure for development permits), consolidated text